The City of Tigard Park System Master Plan Addendum was updated in March. The Addendum is now available for comment until June 16, with only minor content changes from the March addition.

Please note that the cost of the River Terrace Trail, which is proposed to run along the River Terrace Boulevard, was previously included in the parks cost estimate, and is now included in the transportation cost estimate instead of parks.

Public Comment Period (June 2 – 16)

The public comment period for the Park System Master Plan Addendum is now open. Written comments will be accepted from June 2 to June 16. The comments will be shared with City Council at a briefing on June 17. The purpose of this briefing is two-fold: (1) brief Council on the parks and transportation master plan addenda for River Terrace, and (2) review the city’s parks and transportation funds and discuss possible financing strategies for each infrastructure system.

Please address comments to Susan Shanks; susans@tigard-or.gov; City of Tigard Permit Center; 13125 SW Hall Blvd.; Tigard, OR 97223. Comments are due on June 16 at 5:00 p.m. PST.

View the Master Plan Addendum >>